De Portola Road Drainage - Weekly Status

We are continuing with the construction of the De Portola Road Drainage Improvements project between Shiraz Way and approximately 650 feet northerly in the Temecula Valley Wine Country area within the Community of Rancho California of Riverside County. Crews are currently working on the new proposed decorative retaining wall.


Note: There are multiple construction projects on De Portola Road (Rancho Water District, Eastern Municipal Water District, and County of Riverside). Please observe construction warning signs, follow traffic control staff’s directions, and use caution while travelling through. Thank you for your patience and understanding.

Steven Graydeportola
Good Hope Area and Theda Street - Weekly Status

We are continuing with the construction of new proposed sidewalk, cross-gutter, reconstructing asphalt pavement, and other improvements on Steele Peak Drive, Palm Street, Mountain Avenue, and Theda Street in Good Hope Community area.  Currently, the contractor is working on Steele Peak Drive. The roadway is narrow. Please slow down and observe construction warning signs while travelling through. Thank you for your patience and understanding.

Steven Gray
Skyview Road Pedestrian Bridge - Weekly Status

We are continuing with the construction of Skyview Road Pedestrian Bridge over French Valley Channel in the Community of French Valley. The bridge will cross a gap along Skyview Road where there is no existing road crossing at French Valley Channel. The bridge will provide a path between the French Valley Library, located on the northwest side of the bridge, and the Susan LaVorgna Elementary School, located at the southeast corner of the intersection of Skyview Road and Via Santiago/Algarve Avenue. It will provide multipurpose access for both pedestrians and bicyclists, with no vehicular travel other than access for emergency vehicles.


The contractor completed the bridge substructure (supporting reinforced concrete columns). We have begun to erect falsework (temporary supporting structure for bridge construction).


Estimated completion: Summer 2026


No traffic impact. Will monitor and minimize construction noise to adjacent neighborhood. Thank you for your understanding.

Good Hope Area and Theda Street - Weekly Status

We are continuing with the construction of new proposed sidewalk, cross-gutter, reconstructing asphalt pavement, and other improvements on Steele Peak Drive, Palm Street, Mountain Avenue, and Theda Street in Good Hope Community area.  Currently, the contractor is working on Steele Peak Drive. The roadway is narrow. Please slow down and observe construction warning signs while travelling through. Thank you for your patience and understanding.

Steven Gray
De Portola Road Drainage - Weekly Status

We continue with the construction of the De Portola Road Drainage Improvements project between Shiraz Way and approximately 650 feet northerly in the Temecula Valley Wine Country area within the Community of Rancho California of Riverside County. Crews are currently working on a new proposed decorative retaining wall.

Note: There are multiple construction projects on De Portola Road (Rancho Water District, Eastern Municipal Water District, and County of Riverside). Please observe construction warning signs, follow traffic control staff’s directions, and use caution while traveling through. Thank you for your patience and understanding.

Steven Graydeportola
Pauba Road and De Luz Road - Weekly Status

Pauba Rd will continue to be closed until further notice between Via Del Monte and Mesa Verde Circle to allow crews to safely excavate the proposed retaining walls areas. Pauba Rd is estimated to reopen on Friday (06/20/2025). Traffic detour route will follow Rancho California Rd. Please DO NOT ENTER “ROAD CLOSED” areas. Please use caution, observe construction warning signs and detour signs, and follow traffic staff’s directions. Thank you for your patience and understanding.

De Luz Road Culvert Replacement: Crews are continuing to replace multiple culverts on De Luz Rd. Roads will be reduced to one lane with flagging operations during working hours between Via Raquel and Carancho Rd. Please observe construction warning signs, use caution, and follow traffic control staff’s directions. Thank you for your patience and understanding.

Steven Graypauba
Skyview Road Pedestrian Bridge - Weekly Status

We are continuing with the construction of Skyview Road Pedestrian Bridge over French Valley Channel in the Community of French Valley. The bridge will cross a gap along Skyview Road where there is no existing road crossing at French Valley Channel. The bridge will provide a path between the French Valley Library, located on the northwest side of the bridge, and the Susan LaVorgna Elementary School, located at the southeast corner of the intersection of Skyview Road and Via Santiago/Algarve Avenue. It will provide multipurpose access for both pedestrians and bicyclists, with no vehicular travel other than access for emergency vehicles.

The contractor completed the bridge substructure (supporting reinforced concrete columns). We have also begun to erect falsework (temporary supporting structure for bridge construction).

Estimated completion: Summer 2026

No traffic impact. We will monitor and minimize construction noise to adjacent neighborhood. Thank you for your understanding.

Good Hope Area and Theda Street - Weekly Status

We are continuing with the construction of new proposed sidewalk, cross-gutter, reconstructing asphalt pavement, and other improvements on Steele Peak Drive, Palm Street, Mountain Avenue, and Theda Street in Good Hope Community area. Currently, the contractor is working on Steele Peak Drive. The roadway is narrow. Please slow down and observe construction warning signs while travelling through. Thank you for your patience and understanding.

Steven Gray
De Portola Road Drainage - Weekly Status

We continue with the construction of the De Portola Road Drainage Improvements project between Shiraz Way and approximately 650 feet northerly in the Temecula Valley Wine Country area within the Community of Rancho California of Riverside County. Contractor is currently working on new proposed retaining wall.

Note: There are multiple construction projects on De Portola Road (Rancho Water District, Eastern Municipal Water District, and County of Riverside). Please observe construction warning signs, follow traffic control staff’s directions, and use caution while travelling through. Thank you for your patience and understanding.

Steven Graydeportola
Construction Update: Skyview Road Pedestrian Bridge

🚧 Construction Update: Skyview Road Pedestrian Bridge 🌉

Work is moving forward on the new pedestrian and bicycle bridge over French Valley Channel in the Community of French Valley! This bridge will connect the French Valley Library to Susan LaVorgna Elementary School, creating a safe, vehicle-free path (with emergency access only) across the channel.

🔹 Current work: Installing reinforced concrete columns & preparing temporary support structures (falsework).
🔹 Estimated completion: Summer 2026
🔹 No traffic impacts. We’re working to minimize noise for nearby neighbors.

Thank you for your patience and support as we build a safer, more connected community! 👷‍♀️👷‍♂️

#FrenchValley #PedestrianBridge #CommunityConnection #InfrastructureUpdate

Yvette Munoz
Jurupa Grade Separation - CONSTRUCTION ALERT - Week of June 2, 2025

CONSTRUCTION ALERT

Alerta de construcción disponible en español en www.JurupaGradeSeparation.com

Week of June 2, 2025

Work continues throughout the project area with ongoing activities including:

- Railroad track installation

- Drainage improvements

- Construction at the intersection of Jurupa Road and Felspar Street

The intersection of Jurupa Road and Felspar Street remains closed. Please use posted detours and alternate routes to navigate the area safely.

Businesses are open during construction. Access to shopping plazas and local businesses is available on Jurupa and Felspar.

This information may change due to weather or field conditions.

Construction Hotline: 800-679-9570

#JurupaGradeSeparation #JurupaValley #JurupaValleyTraffic

Good Hope Area and Theda Street - Weekly Status

We are continuing with the construction of new proposed sidewalk, cross-gutter, reconstructing asphalt pavement, and other improvements on Steele Peak Drive, Palm Street, Mountain Avenue, and Theda Street in Good Hope Community area. Currently, the contractor is working on Steele Peak Drive. The roadway is narrow. Please slow down and observe construction warning signs while travelling through. Thank you for your patience and understanding.